Usually ready in 24 hours
You have items in your cart. Include them in the spec sheet?
📱 Email yourself this spec sheet link to open on a desktop.
| Assembled | Assembly Required |
| Seating Capacity | 4-6 Adults |
| Product Colors & Material | |
| Leg Material | Wood |
| Table Edge | Wood |
| Table Top Material | Wood |
| Product Dimensions (each) | |
| Shape | Semi Circle/Half Round |
| Size | 99" x 40" Semi Circle/Half Round |
| Length | 99" |
| Width | 40" |
| Height | 30" |
| Height Style | Standard Height |
| Shipping Dimensions (each) | |
| Shipping Length | 101.00" |
| Shipping Width | 51.00" |
| Shipping Height | 5.50" |
| Shipping Weight | 121.50 lbs |
Our Farm Tables also known as Linenless Tables* require some basic care and maintenance to ensure it retains its natural beauty and luster.
*These tables are sometimes referred to as Linenless Tables because they are naturally beautiful. They don’t need linens to look great. You may not want to use a linen as the linen will hide the natural beauty of the table. Some customers like to add linens under heavy use to protect the table from scratches and stains. Ultimately, the choice is yours.
1. Storage:
– When not in use, store in a cool, dry place away from direct sunlight.
– If possible, keep it in a protective case or cover when not in use outdoors.
2. Cleaning:
– Clean regularly with a soft, damp cloth to remove dirt and debris.
– For tougher stains, use a mild soap solution and rinse thoroughly.
– Avoid abrasive cleaners or scrubbers that may scratch the surface.
3. Sun Protection:
– Limit prolonged exposure to direct sunlight to prevent color fading.
– If used outdoors, place in shaded areas when possible.
4. Temperature Considerations:
– While weatherproof, avoid extreme temperature fluctuations.
– In very hot weather, provide shade or bring indoors during peak heat hours.
5. Inspection:
– Regularly inspect for any signs of wear, cracks, or damage.
– If you notice any issues, address them promptly to prevent further deterioration.
6. Handling:
– Despite its durability, handle with care to avoid unnecessary impacts or drops.
– Use both hands when moving or repositioning the chair.
7. Avoid Harsh Chemicals:
– Do not use solvents, bleach, or other harsh chemicals for cleaning or maintenance.
By following these care instructions, you can help maintain the appearance and longevity of your investment, minimizing color fading and ensuring your chair’s durability in various weather conditions.
2 Year Total Coverage - 1 Year Limited Warranty plus 1 FREE Year Extended Warranty for a total of 2 years coverage (a $69.98 value!)
Our limited warranty ensures furniture is free from defects in materials and craftsmanship for the specified period, covering the original purchaser only. It excludes damage from misuse, improper maintenance, normal wear and tear, or environmental factors. If eligible, we will repair, replace or provide parts at no cost, covering all shipping and handling fees. See our Warranty Policy for more details.
See how quickly your investment pays off
Auto-filled from this product's price
Suggested rate based on product price
Drag to adjust (1 – 20)
Estimates are illustrative. Actual returns depend on local market rates, utilization, and operating costs.
Headquarters & Showroom
9000 NW 15th St. Suite 8 - Miami, Florida USA 33172
info@chivari.com (305) 487-8960
!