Serpentine Tables

Serpentine tables are designed with elegant, flowing curves that create a dynamic and visually striking layout. Unlike traditional straight or round tables, these pieces can be arranged in wave-like patterns, half circles, or full circles, making them ideal for weddings, banquets, and upscale events. Their unique shape encourages better guest interaction and adds a modern, sculptural element to any space. Available in durable materials with folding or removable legs for easy setup, serpentine tables are perfect for creating versatile seating arrangements, stylish buffet displays, or statement head tables. Whether you’re planning a sophisticated reception or a creative event design, serpentine tables deliver both functionality and aesthetic appeal.

Serpentine Farm Table - with matching 60" x 40 Rectangle Tables

Setup includes: Two Fruitwood Serpentine Tables and Two 60" x 40" Rectangle Farm Tables

Chivari 60" x 40" (5 Foot) Fruitwood Rectangle Fluted Leg Wood Farm Table TFARMRT6040-FTW-T-AX
60" x 40" (5 Foot) Fruitwood Rectangle Fluted Leg Wood Farm Table

$379.98

Chivari 99" x 40" (8.25 Foot) Fruitwood Serpentine Fluted Leg Wood Farm Table TFARM-SERP-9940-FTW-AX
4-6 Adults
99" x 40" (8.25 Foot) Fruitwood Serpentine Fluted Leg Wood Farm Table

$499.98

Chivari 60" x 40" (5 Foot) Fruitwood Rectangle Fluted Leg Wood Farm Table TFARMRT6040-FTW-T-AX
60" x 40" (5 Foot) Fruitwood Rectangle Fluted Leg Wood Farm Table

$379.98

Chivari 99" x 40" (8.25 Foot) Fruitwood Serpentine Fluted Leg Wood Farm Table TFARM-SERP-9940-FTW-AX
4-6 Adults
99" x 40" (8.25 Foot) Fruitwood Serpentine Fluted Leg Wood Farm Table

$499.98

Serpentine Design Ideas

Fruitwood Serpentine Display

Curved fruitwood farm tables create a flowing serpentine design, beautifully complemented by matching rectangle tables, soft florals, and classic bentwood chairs.

Farm Table Serpentine Display

White distressed serpentine farm tables create a stunning curved layout, beautifully complemented by matching cross‑back chairs and lush floral centerpieces.

Serpentine Plywood Display

Elegant 4‑piece serpentine table circle — a stunning round display perfect for serving food, drinks, or showcasing event accents.

Serpentine Table Layout and Seating Guide

Availability
Shop By Pick Up Location
Type
Color Group
Height Style
Shape
Length
Width
Seating Capacity
Table Top Material
Leg Material
Steel Skeleton
Assembled
Weight Capacity
Loading products...
Filter
19 products
Sort by:
Best selling
View as:
Availability
Shop By Pick Up Location
Type
Color Group
Height Style
Shape
Length
Width
Seating Capacity
Table Top Material
Leg Material
Steel Skeleton
Assembled
Weight Capacity
84" Serpentine Heavy Duty Natural Plywood Folding Table
18% off
Chivari 84" x 30" (7 Foot) Gray Serpentine Heavy Duty Plywood Folding Table TPLYSRP84MG-AX-T
Chivari 84" x 30" (7 Foot) Gray Serpentine Heavy Duty Plywood Folding Table TPLYSRP84MG-AX-T
4-6 AdultsMetal Edge

84" Serpentine Heavy Duty Natural Plywood Folding Table

Sale price
$164.68
Regular price
$199.98
99" x 40" (8.25 Foot) White Distressed Serpentine Fluted Leg Wood Farm Table
17% off
Chivari 99" x 40" (8.25 Foot) White Distressed Serpentine Fluted Leg Wood Farm Table TFARM-SERP-9940-WD-AX
Chivari 99" x 40" (8.25 Foot) White Distressed Serpentine Fluted Leg Wood Farm Table TFARM-SERP-9940-WD-AX
4-6 Adults

99" x 40" (8.25 Foot) White Distressed Serpentine Fluted Leg Wood Farm Table

Sale price
$499.98
Regular price
$599.98
99" x 40" (8.25 Foot) Chestnut Finish Serpentine Fluted Leg Wood Farm Table
17% off
Chivari 99" x 40" (8.25 Foot) Chestnut Serpentine Fluted Leg Wood Farm Table TFARM-SERP-9940-CHT-AX
Chivari 99" x 40" (8.25 Foot) Chestnut Serpentine Fluted Leg Wood Farm Table TFARM-SERP-9940-CHT-AX
4-6 Adults

99" x 40" (8.25 Foot) Chestnut Finish Serpentine Fluted Leg Wood Farm Table

Sale price
$499.98
Regular price
$599.98
S-Curve Serpentine Farm Table Kit - Seats 22 - Includes 4 Chestnut Serpentine Tables
Chivari S-Curve Serpentine Farm Table Kit - Seats 22 - Includes 4 Chestnut Serpentine Tables TFARM-SNKT-CHT1
Chivari S-Curve Serpentine Farm Table Kit - Seats 22 - Includes 4 Chestnut Serpentine Tables TFARM-SNKT-CHT1

S-Curve Serpentine Farm Table Kit - Seats 22 - Includes 4 Chestnut Serpentine Tables

Price
$1,999.92
99" x 40" (8.25 Foot) Fruitwood Serpentine Fluted Leg Wood Farm Table
17% off
Chivari 99" x 40" (8.25 Foot) Fruitwood Serpentine Fluted Leg Wood Farm Table TFARM-SERP-9940-FTW-AX
Chivari 99" x 40" (8.25 Foot) Fruitwood Serpentine Fluted Leg Wood Farm Table TFARM-SERP-9940-FTW-AX
4-6 Adults

99" x 40" (8.25 Foot) Fruitwood Serpentine Fluted Leg Wood Farm Table

Sale price
$499.98
Regular price
$599.98
U-Shape Serpentine Farm Table Kit - Seats 12 - Includes 2 White Distressed Serpentine Tables
Chivari U-Shape Serpentine Farm Table Kit - Seats 12 - Includes 2 White Distressed Serpentine Tables TFARM-SNKT-WD4
Chivari U-Shape Serpentine Farm Table Kit - Seats 12 - Includes 2 White Distressed Serpentine Tables TFARM-SNKT-WD4

U-Shape Serpentine Farm Table Kit - Seats 12 - Includes 2 White Distressed Serpentine Tables

Price
$999.96
Elongated Serpentine Farm Table Kit - Seats 42 - Includes 4 Chestnut Serpentine Tables and 5 Rectangle Tables
Chivari Elongated Serpentine Farm Table Kit - Seats 42 - Includes 4 Chestnut Serpentine Tables and 5 Rectangle Tables TFARM-SNKT-CHT2
Chivari Elongated Serpentine Farm Table Kit - Seats 42 - Includes 4 Chestnut Serpentine Tables and 5 Rectangle Tables TFARM-SNKT-CHT2

Elongated Serpentine Farm Table Kit - Seats 42 - Includes 4 Chestnut Serpentine Tables and 5 Rectangle Tables

Price
$3,899.82
U-Shape Serpentine Farm Table Kit - Seats 12 - Includes 2 Fruitwood Serpentine Tables
Chivari U-Shape Serpentine Farm Table Kit - Seats 12 - Includes 2 Fruitwood Serpentine Tables TFARM-SNKT-FTW4
Chivari U-Shape Serpentine Farm Table Kit - Seats 12 - Includes 2 Fruitwood Serpentine Tables TFARM-SNKT-FTW4

U-Shape Serpentine Farm Table Kit - Seats 12 - Includes 2 Fruitwood Serpentine Tables

Price
$999.96
Enclosed Circle Serpentine Farm Table Kit - Seats 16 - Includes 4 White Distressed Serpentine Tables
Chivari Enclosed Circle Serpentine Farm Table Kit - Seats 16 - Includes 4 White Distressed Serpentine Tables TFARM-SNKT-WD3
Chivari Enclosed Circle Serpentine Farm Table Kit - Seats 16 - Includes 4 White Distressed Serpentine Tables TFARM-SNKT-WD3

Enclosed Circle Serpentine Farm Table Kit - Seats 16 - Includes 4 White Distressed Serpentine Tables

Price
$1,999.92
Elongated Serpentine Farm Table Kit - Seats 42 - Includes 4 White Distressed Serpentine Tables and 5 Rectangle Tables
Chivari Elongated Serpentine Farm Table Kit - Seats 42 - Includes 4 White Distressed Serpentine Tables and 5 Rectangle Tables TFARM-SNKT-WD2
Chivari Elongated Serpentine Farm Table Kit - Seats 42 - Includes 4 White Distressed Serpentine Tables and 5 Rectangle Tables TFARM-SNKT-WD2

Elongated Serpentine Farm Table Kit - Seats 42 - Includes 4 White Distressed Serpentine Tables and 5 Rectangle Tables

Price
$3,899.82
Capsule Bridge Serpentine Farm Table Kit - Seats 20 - Includes 4 White Distressed Serpentine Tables and 2 Rectangle Tables
Chivari Capsule Bridge Serpentine Farm Table Kit - Seats 20 - Includes 4 White Distressed Serpentine Tables and 2 Rectangle Tables TFARM-SNKT-WD5
Chivari Capsule Bridge Serpentine Farm Table Kit - Seats 20 - Includes 4 White Distressed Serpentine Tables and 2 Rectangle Tables TFARM-SNKT-WD5

Capsule Bridge Serpentine Farm Table Kit - Seats 20 - Includes 4 White Distressed Serpentine Tables and 2 Rectangle Tables

Price
$2,759.88
S-Curve Serpentine Farm Table Kit - Seats 22 - Includes 4 White Distressed Serpentine Tables
Chivari S-Curve Serpentine Farm Table Kit - Seats 22 - Includes 4 White Distressed Serpentine Tables TFARM-SNKT-WD1
Chivari S-Curve Serpentine Farm Table Kit - Seats 22 - Includes 4 White Distressed Serpentine Tables TFARM-SNKT-WD1

S-Curve Serpentine Farm Table Kit - Seats 22 - Includes 4 White Distressed Serpentine Tables

Price
$1,999.92
Capsule Bridge Serpentine Farm Table Kit - Seats 20 - Includes 4 Fruitwood Serpentine Tables and 2 Rectangle Tables
Chivari Capsule Bridge Serpentine Farm Table Kit - Seats 20 - Includes 4 Fruitwood Serpentine Tables and 2 Rectangle Tables TFARM-SNKT-FTW5
Chivari Capsule Bridge Serpentine Farm Table Kit - Seats 20 - Includes 4 Fruitwood Serpentine Tables and 2 Rectangle Tables TFARM-SNKT-FTW5

Capsule Bridge Serpentine Farm Table Kit - Seats 20 - Includes 4 Fruitwood Serpentine Tables and 2 Rectangle Tables

Price
$2,759.88
Enclosed Circle Serpentine Farm Table Kit - Seats 16 - Includes 4 Fruitwood Serpentine Tables
Chivari Enclosed Circle Serpentine Farm Table Kit - Seats 16 - Includes 4 Fruitwood Serpentine Tables TFARM-SNKT-FTW3
Chivari Enclosed Circle Serpentine Farm Table Kit - Seats 16 - Includes 4 Fruitwood Serpentine Tables TFARM-SNKT-FTW3

Enclosed Circle Serpentine Farm Table Kit - Seats 16 - Includes 4 Fruitwood Serpentine Tables

Price
$1,999.92
Elongated Serpentine Farm Table Kit - Seats 42 - Includes 4 Fruitwood Serpentine Tables and 5 Rectangle Tables
Chivari Elongated Serpentine Farm Table Kit - Seats 42 - Includes 4 Fruitwood Serpentine Tables and 5 Rectangle Tables TFARM-SNKT-FTW2
Chivari Elongated Serpentine Farm Table Kit - Seats 42 - Includes 4 Fruitwood Serpentine Tables and 5 Rectangle Tables TFARM-SNKT-FTW2

Elongated Serpentine Farm Table Kit - Seats 42 - Includes 4 Fruitwood Serpentine Tables and 5 Rectangle Tables

Price
$3,899.82
Enclosed Circle Serpentine Farm Table Kit - Seats 16 - Includes 4 Chestnut Serpentine Tables
Chivari Enclosed Circle Serpentine Farm Table Kit - Seats 16 - Includes 4 Chestnut Serpentine Tables TFARM-SNKT-CHT3
Chivari Enclosed Circle Serpentine Farm Table Kit - Seats 16 - Includes 4 Chestnut Serpentine Tables TFARM-SNKT-CHT3

Enclosed Circle Serpentine Farm Table Kit - Seats 16 - Includes 4 Chestnut Serpentine Tables

Price
$1,999.92
Capsule Bridge Serpentine Farm Table Kit - Seats 20 - Includes 4 Chestnut Serpentine Tables and 2 Rectangle Tables
Chivari Capsule Bridge Serpentine Farm Table Kit - Seats 20 - Includes 4 Chestnut Serpentine Tables and 2 Rectangle Tables TFARM-SNKT-CHT5
Chivari Capsule Bridge Serpentine Farm Table Kit - Seats 20 - Includes 4 Chestnut Serpentine Tables and 2 Rectangle Tables TFARM-SNKT-CHT5

Capsule Bridge Serpentine Farm Table Kit - Seats 20 - Includes 4 Chestnut Serpentine Tables and 2 Rectangle Tables

Price
$2,759.88
S-Curve Serpentine Farm Table Kit - Seats 22 - Includes 4 Fruitwood Serpentine Tables
Chivari S-Curve Serpentine Farm Table Kit - Seats 22 - Includes 4 Fruitwood Serpentine Tables TFARM-SNKT-FTW1
Chivari S-Curve Serpentine Farm Table Kit - Seats 22 - Includes 4 Fruitwood Serpentine Tables TFARM-SNKT-FTW1

S-Curve Serpentine Farm Table Kit - Seats 22 - Includes 4 Fruitwood Serpentine Tables

Price
$1,999.92
U-Shape Serpentine Farm Table Kit - Seats 12 - Includes 2 Chestnut Serpentine Tables
Chivari U-Shape Serpentine Farm Table Kit - Seats 12 - Includes 2 Chestnut Serpentine Tables TFARM-SNKT-CHT4
Chivari U-Shape Serpentine Farm Table Kit - Seats 12 - Includes 2 Chestnut Serpentine Tables TFARM-SNKT-CHT4

U-Shape Serpentine Farm Table Kit - Seats 12 - Includes 2 Chestnut Serpentine Tables

Price
$999.96

Related Articles